Monday, April 29, 2013

Things are picking up!

A lot has happened in the past couple of weeks.  We found an old cast iron claw foot bathtub for the bathroom off the loft.  It is about a 1930 and the porcelain is in perfect condition. 
It's dirty from being in storage for 10 years and the outside paint is peeling.  Cheri thinks we will scrap off the flaking paint, put new hardware on it, get the claw feet replaced or repainted black and it will be good to go.

Meanwhile we approved the final plans and the architect has produced all of the final drawing copies and the engineering calculations for us to get the building permit.

Now we will submit the request to have the two lots joined together and the building permit granted.

On Wednesday I will start a class on performing the perculation testing so a septic system can be built.

Then we start digging.  Here comes summer!

Jim & Cheri Streeter